The project has deployed 33 1.5MW wind turbines with an installed capacity of 50MW. The project was completed in 2008. During construction, there was no measurement and control signal for the box change, which caused the box change to be an information blind zone. There was a problem of box change burnout on the project, but the reason could not be found, which brought the maintenance personnel on site. Great trouble. In August 2010, our company made a retrofit to the project by adding a box-changing measurement and control device. After the transformation, you can clearly see the operation signal and remote control of the box change in the main control room of the wind farm, which brings great convenience to the maintenance personnel on the spot.