Protector of the maximum capacity of a single unit

Inner Mongolia Wulanchabu Shangdu wind farm, stand-alone capacity of 3MW wind turbine generator system project, is the single largest capacity in Guodian Longyuan land project. Our company with CHINT electric, this project provides 17 Taiwan with differential protection function of wind power control device, the device has perfect primary and backup protection and body protection, with the national inspection report (Certificate No. N0JW120897), the successful implementation of real-time monitoring, protection and control of large capacity wind turbine booster box substation. From our on-site commissioning, equipment operation, follow-up provides a perfect all in one service, take practical action to implement the "Huafu began active, sincere message, finally satisfied with the" principle of service.

Participants in the national scenery storage and transportation project

Country scenery storage demonstration project is currently the largest in the world, using the platform of integrated set new energy wind power, photovoltaic power generation, energy storage, intelligent transmission in one, the project built by the national Power Grid Corp, independent design, through the complementary, energy regulation, intelligent scheduling, the world's first construction thinking and technical route. In the world the first scenery storage of new energy power generation transmission and joint operation mode.
Our response to the national energy call, to actively participate in the construction of two country scenery storage demonstration project in cooperation with Qingdao tgood in Zhang Shangfeng field, provide 35 wind control products, the realization of the fan boost box for real-time monitoring and control, and one-time through the national grid north Hebei Grid Electric Power Research Institute acceptance test.

High altitude plateau product practitioner

Three new energy tin iron mountain wind farm at an elevation of 3300 meters above the peak elevation of 4000 meters high, the peak into the blue skies. Summer season, tin Tieshan surface temperature up to 40 - 50 degrees C. The special geographical environment and high altitude mining, is a huge challenge for all kinds of equipment performance of the wind field. Our company provides 36 wind box substation measurement and control device, at the same time, our service personnel without fear of altitude sickness, actively cooperate with the fused fiber, with complete debugging services, and eventually realize the scene of the box type transformer real-time monitoring and protection, product stable performance, success in dealing with the field working conditions at high altitude.

High temperature salt spray box under the circumstances of the escort

Guangdong Guangdong Xuwen brave wind farm project installed 33 stand-alone capacity of 1500kW wind turbine, installed capacity of 49.5MW. Warrior wind farm is located in the subtropical, tropical monsoon climate, offshore, high salt fog, with an average annual relative humidity of 93%. In order to meet the requirements of farm time, our debugging personnel on-site defying humid and muggy climate, to ensure 168 hours of fighting, finally the scene about grid. Huafu equipment successfully withstand high salt fog, high humidity and high temperature of the sea environment test, to manufacture carefully, sincerely service, realize the users trust and favor!

Box defender at extreme temperatures

Bole City three new energy power project three typhoon Bozhou, Xinjiang is located in the continental arid semi desert and desert climate zone, the sunshine time is long, the temperature difference between day and night. Warm and cold temperature of high temperature in summer, autumn and spring, the long and cold winter. Extreme maximum temperature of 44 degrees, extreme minimum temperature -36 C. Our operation in the 33 wind control box, relying on -40 DEG C to wide temperature and working environment of +70 DEG C, meet the extreme environmental requirements, running more than a year with good response, the stability and reliability of the products to win customers approval and praise.

Hi tech Olympics, Green Olympics approach

Power generation units in Beijing Guanting wind farm project marks the start of Beijing area to achieve a breakthrough in the development and utilization of wind energy, the Beijing area for the first time on the large scale utilization of wind energy resources. It is not only the construction of Beijing Olympic commitments, but also an important measure to strengthen energy conservation and emission reduction work in Beijing, while providing a support point for energy security in Beijing. Our honor for the project to provide box testing equipment, to achieve the specific action to help "Scientific Olympics, Green Olympics" concept, are put into operation for 3 years, running for more than 25 thousand hours, the success of information collection box and protect the wind box operation.

1   Total 6 Record, 10 Items / Page, Total 1 Page
Back To Top
  • Mobile phone QR code

  • WeChat public account