Participants in the national scenery storage and transportation project

Country scenery storage demonstration project is currently the largest in the world, using the platform of integrated set new energy wind power, photovoltaic power generation, energy storage, intelligent transmission in one, the project built by the national Power Grid Corp, independent design, through the complementary, energy regulation, intelligent scheduling, the world's first construction thinking and technical route. In the world the first scenery storage of new energy power generation transmission and joint operation mode.
Our response to the national energy call, to actively participate in the construction of two country scenery storage demonstration project in cooperation with Qingdao tgood in Zhang Shangfeng field, provide 35 wind control products, the realization of the fan boost box for real-time monitoring and control, and one-time through the national grid north Hebei Grid Electric Power Research Institute acceptance test.

High altitude plateau product practitioner

Three new energy tin iron mountain wind farm at an elevation of 3300 meters above the peak elevation of 4000 meters high, the peak into the blue skies. Summer season, tin Tieshan surface temperature up to 40 - 50 degrees C. The special geographical environment and high altitude mining, is a huge challenge for all kinds of equipment performance of the wind field. Our company provides 36 wind box substation measurement and control device, at the same time, our service personnel without fear of altitude sickness, actively cooperate with the fused fiber, with complete debugging services, and eventually realize the scene of the box type transformer real-time monitoring and protection, product stable performance, success in dealing with the field working conditions at high altitude.

High temperature salt spray box under the circumstances of the escort

Guangdong Guangdong Xuwen brave wind farm project installed 33 stand-alone capacity of 1500kW wind turbine, installed capacity of 49.5MW. Warrior wind farm is located in the subtropical, tropical monsoon climate, offshore, high salt fog, with an average annual relative humidity of 93%. In order to meet the requirements of farm time, our debugging personnel on-site defying humid and muggy climate, to ensure 168 hours of fighting, finally the scene about grid. Huafu equipment successfully withstand high salt fog, high humidity and high temperature of the sea environment test, to manufacture carefully, sincerely service, realize the users trust and favor!

Box defender at extreme temperatures

Bole City three new energy power project three typhoon Bozhou, Xinjiang is located in the continental arid semi desert and desert climate zone, the sunshine time is long, the temperature difference between day and night. Warm and cold temperature of high temperature in summer, autumn and spring, the long and cold winter. Extreme maximum temperature of 44 degrees, extreme minimum temperature -36 C. Our operation in the 33 wind control box, relying on -40 DEG C to wide temperature and working environment of +70 DEG C, meet the extreme environmental requirements, running more than a year with good response, the stability and reliability of the products to win customers approval and praise.

Hi tech Olympics, Green Olympics approach

Power generation units in Beijing Guanting wind farm project marks the start of Beijing area to achieve a breakthrough in the development and utilization of wind energy, the Beijing area for the first time on the large scale utilization of wind energy resources. It is not only the construction of Beijing Olympic commitments, but also an important measure to strengthen energy conservation and emission reduction work in Beijing, while providing a support point for energy security in Beijing. Our honor for the project to provide box testing equipment, to achieve the specific action to help "Scientific Olympics, Green Olympics" concept, are put into operation for 3 years, running for more than 25 thousand hours, the success of information collection box and protect the wind box operation.

Application of distributed photovoltaic intelligent grid-connected box (primary and secondary fusion system) in Ningxia Pengyangfu Poverty Alleviation Power Station

On June 25, 2019, the PV poverty alleviation village-level power station in Baoyang Village, Pengyang County was successfully connected to the grid, marking the successful integration of the full capacity of 89 power stations in the 26.68MWp PV poverty alleviation village-level project in Pengyang County. The first full-capacity grid-connected county among the first batch of photovoltaic poverty alleviation village-level power stations. Based on its years of experience in intelligent monitoring and protection in the electric power industry, Beijing Huafu Juneng has been focusing on user-centric products and deepening product innovation. The model of the distributed poverty alleviation photovoltaic grid-connected solution for this project is HF-BSP photovoltaic grid-connected access box. The supporting model is HF-2000 distributed photovoltaic grid-connected interface devices, a total of 89 sets, adopting 4G wireless transmission mode, and the data of Huawei inverters and pole transformers of the distributed photovoltaic area are respectively connected to the Guyuan City dispatching system and The Big Data Center of the Poverty Alleviation Office has fulfilled the requirements for automation and intelligent operation and management of the entire power station.

Guizhou Xishui Erlang power plant 4*660MW

Xishui Erlang power plant led by China Power Investment Corp to carry out preparatory work, planning the installed capacity of 4 * 660MW, a total investment of about 9 billion yuan, a planning, phased construction, energy cooperation is a key project in Chongqing and Guizhou provinces two. Our company provides air-cooled control cabinet equipment, since 2014 since the power to run well, over the years the components replacement rate is zero, the failure rate is zero, by the praise of leaders of Xishui power plant.

Guohua Shouguang 2 * 1000MW project

Guohua Power Plant located in the town of Yang Kou Shouguang Shouguang City, planning capacity of 4 * 1000MW. The first phase of the project is 2 * 1000MW ultra supercritical coal-fired generating units, by the China Shenhua Energy Co, Energy Developments Ltd, Shandong Ludian Shouguang municipal government jointly funded the construction. Guohua Shouguang power project of Shandong power grid is to support a large regional power plant road function, the power to promote the economic development of Shandong province and the the Yellow River delta are making important contributions.

Intelligent transformer cooling control system for our (cabinet) complete with Changzhou Toshiba transformer, high temperature and high humidity in Shouguang environmental temperature, reliable equipment operation, accurate control, significant energy saving effect and prolong the life of the transformer.

Guizhou Xishui Erlang power plant 4*660MW

Xishui Erlang power plant led by China Power Investment Corp to carry out preparatory work, planning the installed capacity of 4 * 660MW, a total investment of about 9 billion yuan, a planning, phased construction, energy cooperation is a key project in Chongqing and Guizhou provinces two. Our company provides air-cooled control cabinet equipment, since 2014 since the power to run well, over the years the components replacement rate is zero, the failure rate is zero, by the praise of leaders of Xishui power plant.

Prev Page 1 2   Total 19 Record, 10 Items / Page, Total 2 Page